Skip to main content

Phase 8 Closure — SNOW IR v1.0

Closure date: 2025-01-XX Tag: v1.0.0 Hindcast report tx: 0x… (Polygon PoS) Production URL: https://snow-ir.app Docs URL: https://snow-ir.app/docs

Scope satisfied

All Phase 8 mandate items in §11 are committed, tested, deployed and observed. The §15 Definition of Done table is fully ticked; evidence links are immutable via the GitHub release artefacts and the on-chain audit anchors.

Operating posture

SNOW IR moves from staging to production civil-protection grade. The Duty Operator rota is active 24×7 with NDMA-aligned escalation. Quarterly STRIDE reviews, weekly automated security scans, nightly hindcast regeneration, and continuous rolling skill telemetry form the maintenance envelope.

Deferred to v1.1 backlog

  • L-band PALSAR-2 wet-snow operational ingest
  • Multi-region failover (Mumbai ↔ Frankfurt)
  • Operator-issued correction inputs with rollback in audit ledger
  • Native Hindi + Dogri + Urdu UI localisation of all bulletins
  • DPDP-2023 audit certification renewal

Sign-off

RoleNameSignatureDate
Tech Lead
V&V Lead
Security Lead
SRE
NDMA Liaison

"From sensor to citizen, every bit accounted for."